An assembly line is a manufacturing process (often called a progressive assembly) in which parts (usually interchangeable parts) are added as the semi-finished assembly moves from workstation to workstation where the parts are added in sequence until the final assembly is produced. By mechanically moving the parts to the assembly work and moving the semi-finished assembly from work station to work station, a finished product can be assembled faster and with less labor than by having workers carry parts to a stationary piece for assembly.

An Airbus A321 on final assembly line 3 in the Airbus Hamburg-Finkenwerder plant
Hyundai's car assembly line

Assembly lines are common methods of assembling complex items such as automobiles and other transportation equipment, household appliances and electronic goods.

Workers in charge of the works of assembly line are called assemblers.[1]

Lotus Cars assembly line as of 2008

Assembly lines are designed for the sequential organization of workers, tools or machines, and parts. The motion of workers is minimized to the extent possible. All parts or assemblies are handled either by conveyors or motorized vehicles such as fork lifts, or gravity, with no manual trucking. Heavy lifting is done by machines such as overhead cranes or forklifts. Each worker typically performs one simple operation unless job rotation strategies are applied.

According to Henry Ford:

The principles of assembly are these:

(1) Place the tools and the men in the sequence of the operation so that each component part shall travel the least possible distance while in the process of finishing.

(2) Use work slides or some other form of carrier so that when a workman completes his operation, he drops the part always in the same place—which place must always be the most convenient place to his hand—and if possible have gravity carry the part to the next workman for his own.

(3) Use sliding assembling lines by which the parts to be assembled are delivered at convenient distances.[2]

Designing assembly lines is a well-established mathematical challenge, referred to as assembly line balancing problem.[3] In the simple assembly line balancing problem the aim is to assign a set of tasks which need to be performed on the work-piece to a sequence of workstations. Each task requires a given task duration for completion. The assignment of tasks to stations is typically limited by two constraints: (1) a precedence graph which indicates what other tasks need to be completed before a particular tasks can be initiated (e.g. not putting in a screw before drilling the hole) and (2) a cycle time which restricts the sum of task processing times which can be completed at each workstation before the work-piece is moved to the next station by the conveyor belt. Major planning problems for operating assembly lines include supply chain integration, inventory control and production scheduling.[4]

Motor assembly line at Willys-Overland Company, Toledo, Ohio, 1920

Consider the assembly of a car: assume that certain steps in the assembly line are to install the engine, install the hood, and install the wheels (in that order, with arbitrary interstitial steps); only one of these steps can be done at a time. In traditional production, only one car would be assembled at a time. If engine installation takes 20 minutes, hood installation takes five minutes, and wheels installation takes 10 minutes, then a car can be produced every 35 minutes.

In an assembly line, car assembly is split between several stations, all working simultaneously. When a station is finished with a car, it passes it on to the next. By having three stations, three cars can be operated on at the same time, each at a different stage of assembly.

After finishing its work on the first car, the engine installation crew can begin working on the second car. While the engine installation crew works on the second car, the first car can be moved to the hood station and fitted with a hood, then to the wheels station and be fitted with wheels. After the engine has been installed on the second car, the second car moves to the hood assembly. At the same time, the third car moves to the engine assembly. When the third car's engine has been mounted, it then can be moved to the hood station; meanwhile, subsequent cars (if any) can be moved to the engine installation station.

Assuming no loss of time when moving a car from one station to another, the longest stage on the assembly line determines the throughput (20 minutes for the engine installation) so a car can be produced every 20 minutes, once the first car taking 35 minutes has been produced.

Before the Industrial Revolution, most manufactured products were made individually by hand. A single craftsman or team of craftsmen would create each part of a product. They would use their skills and tools such as files and knives to create the individual parts. They would then assemble them into the final product, making cut-and-try changes in the parts until they fit and could work together (craft production).

Division of labor was practiced in China, where state-run monopolies mass-produced metal agricultural implements, china, armor, and weapons centuries before mass production appeared in Europe on the eve of the Industrial Revolution.[5] Adam Smith discussed the division of labour in the manufacture of pins at length in his book The Wealth of Nations (published in 1776).

The Venetian Arsenal, dating to about 1104, operated similar to a production line. Ships moved down a canal and were fitted by the various shops they passed. At the peak of its efficiency in the early 16th century, the Arsenal employed some 16,000 people who could apparently produce nearly one ship each day, and could fit out, arm, and provision a newly built galley with standardized parts on an assembly-line basis. Although the Arsenal lasted until the early Industrial Revolution, production line methods did not become common even then.

Industrial Revolution

The Industrial Revolution led to a proliferation of manufacturing and invention. Many industries, notably textiles, firearms, clocks and watches,[6] horse-drawn vehicles, railway locomotives, sewing machines, and bicycles, saw expeditious improvement in materials handling, machining, and assembly during the 19th century, although modern concepts such as industrial engineering and logistics had not yet been named.

The pulley block was the first manufacture to become fully automated, at the Portsmouth Block Mills in the early 19th century.

The automatic flour mill built by Oliver Evans in 1785 was called the beginning of modern bulk material handling by Roe (1916). Evans's mill used a leather belt bucket elevator, screw conveyors, canvas belt conveyors, and other mechanical devices to completely automate the process of making flour. The innovation spread to other mills and breweries.[7][8]

Probably the earliest industrial example of a linear and continuous assembly process is the Portsmouth Block Mills, built between 1801 and 1803. Marc Isambard Brunel (father of Isambard Kingdom Brunel), with the help of Henry Maudslay and others, designed 22 types of machine tools to make the parts for the rigging blocks used by the Royal Navy. This factory was so successful that it remained in use until the 1960s, with the workshop still visible at HM Dockyard in Portsmouth, and still containing some of the original machinery.[9]

One of the earliest examples of an almost modern factory layout, designed for easy material handling, was the Bridgewater Foundry. The factory grounds were bordered by the Bridgewater Canal and the Liverpool and Manchester Railway. The buildings were arranged in a line with a railway for carrying the work going through the buildings. Cranes were used for lifting the heavy work, which sometimes weighed in the tens of tons. The work passed sequentially through to erection of framework and final assembly.[10]

The Bridgewater Foundry, pictured in 1839, one of the earliest factories to use an almost modern layout, workflow, and material-handling system

The first flow assembly line was initiated at the factory of Richard Garrett & Sons, Leiston Works in Leiston in the English county of Suffolk for the manufacture of portable steam engines. The assembly line area was called 'The Long Shop' on account of its length and was fully operational by early 1853. The boiler was brought up from the foundry and put at the start of the line, and as it progressed through the building it would stop at various stages where new parts would be added. From the upper level, where other parts were made, the lighter parts would be lowered over a balcony and then fixed onto the machine on the ground level. When the machine reached the end of the shop, it would be completed. [11]

Interchangeable parts

During the early 19th century, the development of machine tools such as the screw-cutting lathe, metal planer, and milling machine, and of toolpath control via jigs and fixtures, provided the prerequisites for the modern assembly line by making interchangeable parts a practical reality.[12]

Late 19th-century steam and electric conveyors

Steam powered conveyor lifts began being used for loading and unloading ships some time in the last quarter of the 19th century.[13] Hounshell (1984) shows a c. 1885 sketch of an electric powered conveyor moving cans through a filling line in a canning factory.

The meatpacking industry of Chicago is believed to be one of the first industrial assembly lines (or dis-assembly lines) to be utilized in the United States starting in 1867.[14] Workers would stand at fixed stations and a pulley system would bring the meat to each worker and they would complete one task. Henry Ford and others have written about the influence of this slaughterhouse practice on the later developments at Ford Motor Company.[15]

20th century

Ford assembly line, 1913. The magneto assembly line was the first. [16][17]
1913 Experimenting with mounting body on Model T chassis. Ford tested various assembly methods to optimize the procedures before permanently installing the equipment. The actual assembly line used an overhead crane to mount the body.
"> Play media
Ford Model T assembly line circa 1919
"> Play media
Ford Model T assembly line circa 1924
"> Play media
Ford assembly line circa 1930
"> Play media
Ford assembly line circa 1947